Production Systems Engineering: Cost and Performance by Richard Gustavson

By Richard Gustavson

Optimize financial and Technological specifications in construction process Designs This pioneering paintings deals confirmed options, partly created and built on the Charles Stark Draper Laboratory, for opting for optimum source allocation and reasonably-priced creation procedure designs for today’s any-volume production environments. creation platforms Engineering offers a special method that synthesizes appropriate know-how with monetary standards for an built-in resolution. that includes real-world case experiences, this authoritative source establishes a brand new paradigm for the producing global that could even be utilized to different firm environments. assurance comprises: picking a more robust production process layout approach method layout fundamentals, time allocation, assets, charges, and caliber ranking Stochastic analyses additional to deterministic effects method configuration ideas a number of disparate items produced via one procedure international classification as opposed to in most cases handbook platforms deciding upon allowable funding Simultaneous development in yield and cycle-time

Show description

Read Online or Download Production Systems Engineering: Cost and Performance Optimization PDF

Best mechanical books

Advances in Mechanical and Electronic Engineering: Volume 2

This ebook contains the quantity 2 of the court cases of the 2012 foreign convention on Mechanical and digital Engineering(ICMEE2012), held at June 23-24,2012 in Hefei, China. The convention supplied a unprecedented chance to assemble world wide researchers who're operating within the fields. This quantity 2 is targeting Mechatronic Engineering and know-how, digital Engineering and digital info expertise .

Concurrent Engineering: Tools and Technologies for Mechanical System Design

Those court cases comprise lectures awarded on the NATO complicated research Institute on Concurrent Engineering instruments and applied sciences for Mechanical method layout held in Iowa urban, Iowa, 25 may perhaps -5 June, 1992. Lectures have been provided by means of leaders from Europe and North the US in disciplines contributing to the rising overseas specialise in Concurrent Engineering of mechanical platforms.

Fuels to drive our future

Attracts jointly appropriate geological, technical, monetary, and environmental components and recommends particular instructions for US study and improvement efforts on substitute gasoline resources. This quantity turns out to be useful for executives and engineers within the car and gasoline industries, policymakers, environmental and replacement gas experts, and extra.

Extra resources for Production Systems Engineering: Cost and Performance Optimization

Sample text

The type of mate, which must occur between any two components, is specified along with multiples, if required. From this information, an assembly sequence, assembly process plan, and a task/resource matrix can be derived; this procedure may be accomplished manually or aided by automated procedures. 4 Establishing the Process Plan for an Assembly System The first step is to specify the tasks that must be performed. An automated method for determining an assembly process plan is described in App. C.

1 (unit cost decreases as production volume increases). For this particular simplified example, there is clearly a production range for which each of the three generic resource types is most cost-effective. However, such a “textbook” scenario is seldom encountered for actual applications, and a significant rethinking of this concept led to a much-improved solution technique, which is described later in this book. 7 Variable Cost for a Task The variable cost to perform a task (using activity-based costing∗ ) is a combination of average loaded labor rate L H and the operating/maintenance rate Oi for a resource type.

5. 0 Each task must have a resource type assigned to it. There are fixed (annualized) and variable costs associated with that allocation. Depending upon the available time, there will generally be more than one workstation in the resulting system. An easy way to distinguish different stations is to look at the tool number(s)—when a new station is required, the tool number(s) assigned increases by 1000. 3) thus has eight stations. Each station may be able to reuse a tool; note that its cost occurs only once.

Download PDF sample

Production Systems Engineering: Cost and Performance by Richard Gustavson
Rated 4.07 of 5 – based on 11 votes